installation maintenance and operation manual of crushing plant

crushing plant installation, operation and maintain - jxsc mine

An efficient, energy-saving and environmental protection crushing plant not only depends on the high-quality stone crusher machine, but also depends on the good connection and cooperation among various equipment. If you want the crushing equipment of crushing plant to keep high-efficient steady working, the daily maintenance and repair work must do well. How to set up a good rock crusher plant?

1. Setting up markers to control the thickness of the paving, such as horizontal standard or raised stakes, or bouncing horizontal elevations or nailing horizontal elevations onto fixed building walls, grooves, and ditch slopes.

2. When the groundwater level is higher than the bottom of the foundation trench, the measures of drainage or lowering the groundwater level should be taken to keep the foundation trench without water.

3. Before proving, the relevant units should be organized to jointly check the groove, including the axis size, horizontal elevation, geological conditions. If you discover holes, ditches, wells and so on, you should dispose well before building the foundation.

3. After the jaw crusher is running normally, the vibrating feeder can be started. And alter the feed quantity by adjusting the feeding belt according to the size of the material block and the operation of the jaw crusher. In general, the height of material accumulation in the crushing chamber should exceed 2 / 3 of the crushing chamber height. The diameter of the block should not exceed 50%-60% of the width of the inlet. At this time the production capacity of jaw crusher is high. It will cause blocking if the material bigger, then affect normal production.

4. To prevent metal objects (such as shovel teeth, track plate, drill, etc.) into the crusher machine to avoid damage to the machine. You should inform the next post operators immediately, and take out in time to prevent accidents from entering the secondary crusher system.

The higher usage frequency machine is crushing equipment in the crusher production plant. To ensure higher production efficiency and longer service life, plant manufacturers must do a good job of maintenance.

2. Daily maintenance In order to ensure that the crushing equipment is in good technical condition, to reduce the downtime of failures, and to improve the intact rate and utilization rate. It is necessary to carry out regular maintenance or even compulsory maintenance, and correctly handle the relationship between maintenance and repair. Its not allowed to just use it or just use it.

3. Lubrication and maintenance Regular attention and timely lubrication of the friction surface can ensure the normal operation of the crushing equipment. The Grease added to the bearing housing is 50-70% of the volume and must be replaced every three months. Such as it needs to use gasoline or kerosene to clean the bearing roller runway when oil change.

4. Maintenance during the run-in period of the plant It is very important that the connection and cooperation of a stone crusher plant equipment. When the users purchase the crushing plant equipment and put it into normal use. They need a long running-in period. For example, if the feeding and conveying links cannot be synchronized, it is easy to block, or the radiation range is too wide to affect the efficiency of the production line. Also some damage to the equipment.

However, in order to meet the deadline, most users ignore some small parts that should be paid attention to during the running-in period. Or make the machine overwork for a long time, which leads to frequent failures in the early stage. It not only affects the normal use of the machine, but also shortens its service life. Whats worse, it affects the progress of the project because of the destruction of machinery,

1. Making a big comprehensive safety production inspection for crushing plant every month. And analysis the results of the inspection, formulate corrective measures. and written by the department in charge of safety for filing.

2. The workshop team recurring inspect. If you discover the problem, you should report to the leadership and the specialized department in time. It needs to solve and not allow working with the problem to make sure the safety job of the whole rock crusher plant.

3. The electric installation, crusher machine, conveyance such as belt conveyor, and protective equipment need to check for them every year. Problems found in the inspection should be written, file for future reference, and solve within a time limit to ensure safety in production.

JXSC is a factory which manufactures stone crusher machine. We have professional engineers and stylists in the crushing aspect. And as a crusher manufacturer, we have 40 years of production experience. The proven technique is our factory advantage.

Jiangxi Shicheng stone crusher manufacturer is a new and high-tech factory specialized in R&D and manufacturing crushing lines, beneficial equipment,sand-making machinery and grinding plants. Read More

the installation and maintenance of mobile crushing plant - aimix group

As long as you purchase our equipment, we will send special technicians to help you to install the machine andgive you online guide. But in fact, the installation and maintenance of these machines are not difficult, and today Ill give you a detailed introduction.

1. Good lubrication has a great relationship with the life of bearing as the bearing shoulder the full load of the machine. The bearing could directly affect the machines life and operating rate, which requires the lubricating oil that is injected in the machine must be clean, and the seal must be good.

5. In case the live bearing cannot move on the chassis when encounters something that cannot be crushed and then cause serious accidents, you should remove the dust or something of the kind on the pedestal which holds the mobile equipment.

5. Have empty load test run after checking off, it can have normal production if there is no any problem with the test run. Please feel free to give your inquiry in the form below. We will reply in 24 hours.