Rate analysis for concrete calculate quantity and cost, hi guys in this article we know about rate analysis of concrete m15, M10 and m7.5. Rate analysis comprise of sum of material cost, labour cost, overhead expenses, contractor profit and cost of equipment or tools. And also know about cost and quantity of cement, sand aggregate & water required for 1 cubic metre of m15 M10 and m7.5 concrete.

Rate Analysis for concrete :- It is a summary of all the cost involved in doing particular work or unit work like material cost, labour cost, overhead expenses, water charges & contractor profit. For rate analysis, the details about all the operation involved in carrying out the work should be available.

The quantities of materials cement sand aggregate and water are required and their cost should be known and the number of different categories of labours required and the capacity of doing work per labour and their wages per day should be known. These can be known only from the experience of particular work. Concrete structure is generally PCC por making Road,pavement, flooring, basement and etc

Rate analysis for concrete work summary of all the quantity and cost of material, labours overhead expenses, contractor profit charges and water charges. Rate analysis for concrete is comprise of following:-

M 15 grade of concrete have cement, sand and aggregate ratio 1:2:4 in which one part is cement, 2 part is sand and 3 part is aggregate. For quantity and cost calculation for m15 grade of concrete we should follow following steps:-

step 6, labour rate and charges :- consider one mason and 2 helper completed 1 cubic metre of concrete work in 8 hour, per mason rate INR 600 and per Helper rate 400,then cost of labour in concreting work = 600 +(2400) = INR 1400.

step 12 :- rate per sq feet for concrete m15,consider thickness of concrete structure is 6 inch (0.5 ft) thick and 1m3 = 35.3147 cft so Area of concrete structure in square feet = 35.3147/0.5 = 70.6 sq ft

M10 grade of concrete have cement, sand and aggregate ratio 1:3:6 in which one part is cement, 3 part is sand and 6 part is aggregate. For quantity and cost calculation for m10 grade of concrete we should follow following steps:-

step 6, labour rate and charges :- consider one mason and 2 helper completed 1 cubic metre of concrete work in 8 hour, per mason rate INR 600 and per Helper rate 400,then cost of labour in concreting work = 600 +(2400) = INR 1400.

step 12 :- rate per sq feet for concrete m10,consider thickness of concrete structure is 6 inch (0.5 ft) thick and 1m3 = 35.3147 cft so Area of concrete structure in square feet = 35.3147/0.5 = 70.6 sq ft

M7.5 grade of concrete have cement, sand and aggregate ratio 1:4:8 in which one part is cement, 4 part is sand and 8 part is aggregate. For quantity and cost calculation for m7.5 grade of concrete we should follow following steps:-

step 6, labour rate and charges :- consider one mason and 2 helper completed 1 cubic metre of concrete work in 8 hour, per mason rate INR 600 and per Helper rate 400,then cost of labour in concreting work = 600 +(2400) = INR 1400.

step 12:- rate per sq feet for concrete m7.5,consider thickness of concrete structure is 6 inch (0.5 ft) thick and 1m3 = 35.3147 cft so Area of concrete structure in square feet = 35.3147/0.5 = 70.6 sq ft

how much does concrete cost per cubic meter?

Also, how much does it cost to pour a 20x30 slab? Concrete Slab Prices By Size Slab Size Square Feet Average Cost Installed 15x15 225 $1,388 20x20 400 $2,468 24x24 576 $3,554 20x30 600 $3,702

What Is The Minimum Amount of Concrete for Delivery? The minimum concrete delivery for ready-mix concrete is a truckload of about 10 cubic yards at $119 to $147 per cubic yard. If you order less than 10 cubic yards of cement, there will be an additional fee of approximately $53 per cubic yard.

How to calculate concrete: Determine how thick you want the concrete. Measure the length and width that you'd like to cover. Multiply the length by the width to determine square footage. Convert the thickness from inches to feet. Multiply the thickness in feet by the square footage to determine cubic feet.

The quantities of materials for 1 m3 of concrete production can be calculated as follows: The weight of cement required = 7.29 x 50 = 364.5 kg. Weight of fine aggregate (sand) = 1.5 x 364.5 = 546.75 kg. Weight of coarse aggregate = 3 x 364.5 = 1093.5 kg.

As for thickness, non-reinforced pavement four inches thick is standard for passenger car driveways. For heavier vehicles, a thickness of five inches is recommended. To eliminate standing water, the driveway should be sloped towards the street a minimum of one percent, or 1/8 inch per foot, for proper drainage.

One of the least expensive ways to get concrete is to mix your own. You can buy bags of the mix from a home improvement store. Typically, you only have to add water for it to be ready to pour. However, it is important to get the ratio right and to mix the concrete thoroughly.

Pour concrete over a solid, well-drained base Because concrete slabs float on the soil, soft ground or voids underneath may cause unsupported areas to crack under heavy weight like vehicles. Pack about 4 in. of sand or gravel over clay and other poorly draining soils to provide even support.

The bulk of the work for a new DIY concrete slab is in the excavation and form building. If you have to level a sloped site or bring in a lot of fill, hire an excavator for a day to help prepare the site. Then figure on spending a day building the forms and another pouring the slab.

Concrete is more durable than cement. Yes, concrete can last hundreds of years, but cement is much less durable. To use an analogy, cement is to concrete as milk is to ice cream. Sure, ice cream has milk in it, but it isn't milk. It's actually much better.

The difference between cement and concrete Concrete is basically a mixture of aggregates and paste. The aggregates are sand and gravel or crushed stone; the paste is water and portland cement. Concrete gets stronger as it gets older. Cement comprises from 10 to 15 percent of the concrete mix, by volume.

If the existing concrete is in good shape structurally, you can pour new concrete over it to freshen it up. Proper prep work is key to success when layering new concrete over old. If the existing concrete is in good shape structurally, you can pour new concrete over it to freshen it up.

Cost. Ignoring any maintenance costs, asphalt is generally much cheaper to install than concrete. Concrete, on the other hand, can run between $4.00 to $6.00 per square foot for basic installation and can cost more depending on different finishes and detail.

average labour cost/price for brickwork and foundations

BRICKWORK, FOUNDATIONS & POINTING COSTS/PRICES These prices are per square metre (p/sq.m.) and per cubic metre (p/c.m.) where applicable The prices below will refer to:- building brick walls- knocking down brick walls- removing brick rubble to the tip- laying/pouring concrete foundations- laying concrete/thermalite blocks- re-pointing brick walls- knocking-through wallsPlease bear in mind - these prices include labour, materials, tipping, scaffolding etc. but not VAT. If your builder is VAT registered, they will add 20% to the price.The brickwork and blockwork prices below WILL INCLUDE the bricks/blocks, the mortar, plasticiser, laying and pointing up.Concrete prices will include labour, mixing and the concrete itself.A 7m2 Skip will cost you in the region of 260.00 p/sq.m. = per square metrep/c.m. = per cubic metreJob DescriptionJob PriceDemolish an existing 100mm thick brick wall.45 p/sq.m.Demolish an existing 230mm thick brick wall.75 p/sq.m.Remove an existing inadequate concrete foundation.120 p/c.m.Excavate for and lay a new concrete foundation.185 p/c.m.Build a 100mm thick garden wall with piers, using facing bricks.150 p/sq.m.Build a 230mm thick garden wall using stock bricks.325 p/sq.m.Lay internal blockwork (min. 75 sq.m.).20 p/sq.m.Lay face brickwork (min. 75 sq. m.).50 p/sq.m.Rake out for and re-point at ground level.12 p/sq.m.Rake out for and re-point at first floor level and above.30 p/sq.m.Cut out existing 100mm thick brickwork for a new door opening, fit a lintol.425 As above but through a 230mm or cavity wall.500

labour rate for building construction in india - civil sir

Labour rate for building construction in India, Hi guys in this article we know about labour rate for building construction, civil work and also know about plastering, brickwork, RCC work, PCC work, etc. per square foot or per square metre in india.

Labour rate & cost in civil construction depends on various factors 1) the type of building: whether residential/ commercial/institutional or industrial. 2) It depends on the type of construction: whether it is a RCC building or a steel building. 3)There are other factors also involved like : number of floors required. Loading on the floor, area where the building is to be constructed, soil conditions, site filling requirements etc.

Labour rate per square foot: In india, Labour rate & cost per square foot is around 210 to 300 Rs for Residential/ commercial/ institutional building, it contains labour cost approx 140 to 200 Rs per square foot for building a structure or civil work and around 70 to 100 Rs per square foot for finishing like tiling, electrical fitting, plumbing fixture, painting and putty, door framing and fabrication and miscellaneous work like curing, repair, storage and security.

Labour rate per square meter: In india, Labour rate & cost per square meter is around 2300 to 3200 Rs for Residential/commercial/ institutional building, it contains labour cost approx 1550 to 2150 Rs per square meter for building a structure or civil work and around 750 to 1050 Rs per square meter for finishing like tiling, electrical fitting, plumbing fixture, painting and putty, door framing and fabrication and miscellaneous work like curing, repair, storage and security.

In india, Labour rate for earthwork excavation is around 10 to 12 Rs per cft (cubic foot) or 354 to 424 Rs per cubic meter (m3). hydraulic excavator can excavate 240 m3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000.

Labour cost for 1000 sq ft house: in India for normal residential/ commercial/ public building, labour cost for house construction is around rs 210 to 300 per sq ft, labour cost for 1000 sq ft house = 210 1000 = rs 210000 or 3001000 = rs300000, so labour cost for 1000 sq ft house is ranging between 2.1 lakh to 3 lakh, this amount is sum of labour cost for civil and finishing work plus shuttering charges and contractor profit.

Labour cost for 1200 sq ft house: in India for normal residential/ commercial/ public building, labour cost for house construction is around rs 210 to 300 per sq ft, labour cost for 1000 sq ft house = 210 1200 = rs 252000 or 3001200 = rs360000, so labour cost for 1200 sq ft house is ranging between 2.52 lakh to 3.6 lakh, this amount is sum of labour cost for civil and finishing work plus shuttering charges and contractor profit.

Labour cost for 1500 sq ft house:- in India for normal residential/ commercial/ public building, labour cost for house construction is around rs 210 to 300 per sq ft, labour cost for 1500 sq ft house = 210 1500 = rs 315000 or 3001500 = rs450000, so labour cost for 1000 sq ft house is ranging between 3.15 lakh to 4.5 lakh, this amount is sum of labour cost for civil and finishing work plus shuttering charges and contractor profit.

Labour cost per 1000 bricks:- in India for normal residential/ commercial/ public building, labour cost for brick masonry is ranging between rs 26 to 32 per sq ft, there is 8.58 nos bricks in 1 sq ft of 9 inch thick brickwork, so area brickwork in 1000 bricks = 1000 8.58= 116 sq ft, labour cost per 1000 bricks = 116 26 = rs 3016 or 116 32 = rs 3712, so average labour cost per 1000 bricks is ranging between rs 3000 to 3700.

In india, Labour rate for block/brick work is around 20 to 35 Rs per square foot, it depends on thickness of block/ brick wall, for 8 thick block/brick wall it will cost around rs 35/sq ft, for 6 thick block/brick wall it will cost around rs 26/sq ft and for 4 thick block/brick wall it will cost around rs 20/sq ft.

In india, Labour rate for plastering is around 12 to 25 Rs per square foot, it depends on thickness and types of plaster, for 20mm thick external wall plaster it will cost around 18 to 25 Rs per sq ft, for 12mm internal plaster it will cost around 15 to 18 Rs per sq ft and for 6mm thick ceiling/concrete wall plaster it will cost around 12 to 15 Rs per sq ft.

Building a structure there is different labour rate are following:- upto plinth level including footing =rs 50/ sq ft, upto 1st slab =rs 45/sq ft, brickwork = rs 25/sq ft, plaster = rs 20/sq ft and for finishing and miscellaneous is electrical fitting =rs 8/sq ft, plumbing fixtures = rs 15/sq ft, painting & putty = rs 10/sq ft, door, frame and fabrication = rs 10/sq ft, flooring = rs 20/ sq ft and for miscellaneous for curing, repair, storage and security = rs 5/sq ft.

rcc cost per cubic feet/ cubic meter/ sq ft - civil sir

Cost of RCC concrete depends on various factors relating grade of concrete, if we use higher grade of concrete then cost will increases, it will also depend on Grade of Steel, mix ratio of concrete, labour charges, machinery charges and cost of raw material like cement, sand and aggregate. Rate of raw material differ from place to place.

There is different RCC structure in house construction like slab, beam and column. Quantity of steel used in slab beam and column is different, so cost of RCC goes up and down according to RCC structure, Steel quantity require less for slab then beam and column, so cost of RCC increases for beam and column.

By Thumb Rule, minimum Steel quantity used in column is about 1% and maximum upto 6 %, in beam minimum steel used is 1% and maximum upto 2% and in slab minimum steel quantity required is about 0.7 and maximum upto 1%.

Thumb rule for various Raw materials are following:- 1) steel used in rcc slab is 80kg/cubic meter, 2) cement used is around 5kg/ sq ft, 3) Sand used is about 0.175 cft/ sq ft, 4) Aggregate used is about 0.350 cft/ sq ft and 5) Labour and shuttering charges is around rs 60/ sq ft.

1) Steel required for 1000 square feet rcc slab:- Thumb rule for Steel required for RCC slab is 80 kgs/m3, then quantity of steel required for 1000 sq ft ( 11.8 m3) rcc slab is equal to = 80 1.18 = 945 Kgs.

2) Cement required for 1000 sq ft rcc slab:- Thumb rule for cement required for RCC slab is 5 kgs/ sq ft, then quantity of cement required for 1000 sq ft ( 11.8 m3) rcc slab is equal to = 5 1000/50 = 100 bags cement.

3) Sand required for 1000 sq ft rcc slab:- Thumb rule for sand required for RCC slab is 0.175cft/ sq ft, then quantity of sand required for 1000 sq ft ( 11.8 m3) rcc slab is equal to = 0.175 1000 = 175 cft.

4) aggregate required for 1000 sq ft rcc slab:- Thumb rule for aggregate required for RCC slab is 0.350cft/ sq ft, then quantity of aggregate required for 1000 sq ft ( 11.8 m3) rcc slab is equal to = 0.350 1000 = 350 cft.

RCC cost per cubic feet (cft):- the cost of RCC is differ from place to place according to raw material cost at particular place. However in general rates/cost of RCC is around rs 423 per cubic feet (cft). This cost includes cost of cement, sand, aggregate, Steel, labour of laying concrete, shuttering cost with labour and machinery charges.

RCC cost per square feet (sq ft):- the cost of RCC is differ from place to place according to raw material cost at particular place. However in general rates/cost of RCC is around rs 176 per square feet (sq ft). This cost includes cost of cement, sand, aggregate, Steel, labour of laying concrete, shuttering cost with labour and machinery charges.

RCC cost per cubic meter (m3):- the cost of RCC is differ from place to place according to raw material cost at particular place. However in general rates/cost of RCC is around rs 14932 per cubic meter (m3). This cost includes cost of cement, sand, aggregate, Steel, labour of laying concrete, shuttering cost with labour and machinery charges.

rate analysis of rcc (reinforcement cement concrete)

All calculations of Reinforcement Cement Concrete for rate analysis. This calculation calculates of cement, sand, Aggregate, and Reinforcement (RCC = Cement + Sand + Aggregate + Reinforcement mixture this call RCC) for materials.

Unless otherwise stated, all work shall bemeasurednet in the decimal system as fixed in its place as given in below point no 1. to below point no 3. Any work is done extra over the specified dimensions shall be ignored.

As per calculation of rate analysis in labor consumption per Cu.m. requirement as per our experience orCPWDbook, this book public byCentral Public Works Department, Government of Indiafor easy calculation of the rate analysis, etc.

Rate Analysis It is a summary of all thecostinvolved in doing particular work or unit work. For calculating therateper unit of an item following sub-heads are estimated and added together to get therate per unit of an item.

Aw, this was a very nice post. In thought I wish to put in writing like this moreover taking time and actual effort to make a very good article but what can I say I procrastinate alot and on no account appear to get something done.

Privacy Policy | Contact Us | Cookie Policy | Sitemap | Sitemap for Hindi Copyright 2019-2021 CivilJungle.com | The Content May Not Be Reproduced On Other Websites | Website Maintained By Hashtag360

how to price/quote for concrete works - structville

In civil engineering construction works, contractors bidding for a job are always required to specify the rate they will use in executing a given item of work. In a competitive bidding, the client will review the rates supplied by the bidders, and award the contract to the person he finds most suitable. Concrete is a common construction material that is basically made from cement, sand, gravel, and water. The main aim of this article is to teach you how to build up your rate, and quote for concrete in construction works.

The unit of concrete in construction is specified in cubic metres (m3). For instance, if a floor slab has a net area of 250 m2, and a thickness of 150 mm, the volume of concrete required will be stated as (250 x 0.15 = 37.5 m3). In the bill, a contractor is expected to state the cost of casting a cubic metre of the specified grade concrete (say grade 25), which can be used to relate the cost of casting the entire slab. Note that the rate supplied by the contractor is expected to include the cost of materials, plant, transportation, labour, and contractors profits.

There are basic considerations to make while quoting for concrete because you should not bid too high or too low. It is possible for contractors to have a wide difference in their rates for the same job. For a competitive tender without bias, a company that is going to hire equipment will likely bid higher than a company that has its own equipment. The same goes with labour, transport facilities, etc. Bidding for a job should be an intelligent process, and the contractor should know his capacity as it will likely influence his cost and profitability. The cost of casting concrete in one day is not the same with casting it for two days. Therefore, a contractors capacity can enable him bid higher or lower depending on the context.

In the past, we have made a post on how you can achieve grade 25 concrete on site. We were able to show that the mix ratio of 1:2.5:3.5 can yield grade 25 concrete. Let us assume you wish to use this mix ratio in building your rate.The total volume in the mix ratio is given by;1 + 2.5 + 3.5 = 7CementRatio of cement by volume = 1/7 Density = mass/volume Mass of cement required = (1/7) x 1440 = 205.7 kgMaking allowance for shrinkage = 1.54 x 205.7 = 316.77 kgNumber of bags of cement required per of concrete = 316.77/50 = 6.33 bags (use 7 bags)SandRatio of sand by volume = 2.5/7 Density = mass/volume Mass of sand required = (2.5/7) x 1650 = 589.285 kgMaking allowance for shrinkage = 1.54 x 589.285 = 907.498 kgMaking allowance for waste = 1.2 x 907.498 = 1088.99 kg/m3 GraniteRatio of granite by volume = 3.5/7 Density = mass/volume Mass of granite required = (3.5/7) x 1650 = 825 kgMaking allowance for shrinkage = 1.54 x 825 = 1270.5 kgMaking allowance for waste = 1.15 x 1270.5 = 1461.075 kg/m3

Cost of materialsCost of cement per cubic metre concrete = 7 x 2,700 = 18,900Cost of sharp sand per cubic metre of concrete = 2.25 x 1088.99 = 2,451Cost of granite per cubic metre of concrete = 4.167 x 1461.075 = 6,089Total Material Cost = 27,440 per cubic metre of concrete

Structville is a media channel dedicated to civil engineering designs, tutorials, research, and general development. At Structville, we stop at nothing in giving you new dimensions to the profession of civil engineering.

how many labour need to pour 100 cubic meters concrete - binq mining

1 .95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second class mason Re: HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER. Answer Answer # 4, Please tell me How many Cum can do a mason. if you know Answer # 6, for the rates of all labours, masssons etc we have to check

Calculating how much concrete you need for a project is simply a matter of math. Because of this, you want your final measurement to be in cubic feet or cubic concrete for a column that is 12 feet high and is circular with a diameter of 1 foot. Concrete Slab in Yards; How to Calculate Concrete Needed To Pour a Slab

1. Measure the Length (L). For an example lets say it's 12 feet 6 inches. 2 If you' re calculating for Cubic Feet or Cubic Yards of Concrete needed, you Calculating Cubic Meters is much easier since the Metric system eliminates If you are doing a large pour with multiple transit mixers have them spaced by out correctly.

Concreters buy concrete for your job by the cubic metre, so they'll calculate It is 25 meter square and have dug the ground down by 100mm and is level. price inclusive of everything including materials, paint and labour that would be great.

I'm not sure how much concrete I need, can you help me? Our minimum delivery charge is 1 metre although if you need to use less you can carry enough cement, aggregate and water to mix up to12 cubic metres in a single delivery. amount of raw materials you need and allocating valuable labour to mix concrete.

How much cement sand and stone do you need for 1 cubic meter of concrete? How much How much does it cost to pour a concrete house slab in Australia? Popularity: 1 . What is average labor price to install cement siding? Popularity: 1

Ready Mixed Concrete FAQs What 'mix' do I need? Please refer to our on-line concrete calculator. How much does 1 cubic metre of concrete weigh? finish the concrete be well prepared for the delivery, have sufficient labour and don't

.1 Cementitious content in kilograms per cubic metre or equivalent units for . ( viii) Any other pour-specific items that the Contractor or Engineer may need to .. his facilities and labour and equipment in order to complete the proposed pour, or

Building a concrete driveway does require a lot or labour and can be costly. Remember that for such a job as a concreting a driveway you will need the help of one or To find out how much your concrete driveway will cost and the volume of you cannot order cubic metres of concrete you must order 8 cubic metres.

Many older homes have a 'suspended' ground floor, with timber joists spanning 12 cubic metres concrete, (mix type ST2 or GEN 1) @ /m, item but if the pour was spread over more than one day and the labour requirement

We need to pour ready mix concrete into these trenches and the cost of them are based to work out how many cubic meters of concrete we will need for our foundation. On top of this cost you have to add the labour cost and the cost of reinforced For example if you are 1 meter above the ready mix you probably need

It is also the most costly and labour-intensive (however it should be A floating concrete foundation is typically four inches thick (100 mm), which despite The area of the pour should be lined with a PVC Damp Proof Membrane (DPM). will have over a cubic metre of concrete in it, so be prepared for some work here!

Because it is a fluid, concrete can be pumped to where it is needed. at very high volumes and because of the labour saving nature of the placing boom. Concrete pump designers face many challenges because concrete is heavy, viscous, meters ( ft); Pumping rate: 140 cubic meters per hour (180 cuyd/h).

We want your concrete pour to be successful we hope this information will help. One cubic yard of concrete will fill a space that is one yard wide by one yard deep, is the same thing mathematically, but is easier for many people to remember. If you need to wheel the concrete, you will need 1-3 wheelbarrow operators

Less than half the water it contains is needed for the hydration of cement. To put this another way, each additional 10 litres of water per cubic metre will reduce about the labour saving effect that "a little" added water has on workability of concrete. equipment so "a little" water may be added to concrete during a pour.

construction board of engineers & contractors: rate analysis of pcc : (plain cement concrete)